Новости


« 1 1 »


Waterproofing of the Kombank-Arena, Belgrade without excavation!

Kombank-Arena in Serbia

In December 2016 and January 2017 KÖSTER BAUCHEMIE AG was entrusted with repairing a failed waterproofing system at the Kombank-Arena in Belgrade, Serbia. The prominent arena is set to host the European Indoor Athletics Championships in March 2017.

Video: On site Interview about the project

... подробнее


Знаете ли вы...?

KÖSTER Superpacker 13 mm x 85 mm PH

The KÖSTER Superpacker is particularly suitable for pressure injections.

The KÖSTER Superpacker provides a very high contact pressure to the borehole due to the cone-shaped center of the tightening mechanism. Four fins and two ridges on the rubber gasket prevent rotation during tightening and facilitate the optimal fixation of the packer in the borehole. It has a firmly mounted pan-head fitting for pressure injection and is galvanised.

 

Back

Top
Austria Brasil Bulgaria China Croatia Denmark Finland France Germany Ghana Greece Hungary Italy Japan Kazakhstan Korea Latvia Lebanon Mexico Netherlands Norway Panama Philippines Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia Thailand Turkey Ukraine United Kingdom United States of America